Thermal paper coating process inspection
Thermal paper coating process inspection record form
Thermal paper coating process inspection record form
Applicable processes : Primer, thermal color developer, topcoat/protective layer – full coating process.
Inspection frequency : Initial inspection upon machine startup, inspection every 30 minutes, mandatory inspection after roll change/machine adjustment.
Applicable products : Ordinary thermal paper, three-proof thermal paper, POS/label thermal master rolls.
Basic production information
date: Shift: Morning/Midday/Evening
Machine Number: Operator: Patrol Inspector: Work order number:
Product Specifications: Production in meters:
Coating structure: Primer □ Color-developing coating Topcoat
I. Production Environment Inspection (Required)
|
Inspection items |
Standard requirements |
measured data |
Determine OK/NG |
Remark |
|
Workshop temperature |
22–28℃ |
|
|
|
|
Workshop humidity |
40%–60% (>60% may result in uneven coating or whitening) |
|
|
|
|
Environmental cleanliness |
No floating dust, no debris, and no scale buildup on the roller surface. |
Visual inspection |
|
|
II. Inspection of Equipment Process Parameters (Core Quality Control)
|
Inspection items |
process standards |
Measured value |
determination |
Exception Log |
|
production line speed |
Set the speed to ±5m/min according to the work order. |
|
|
|
|
Coating roller gap |
Standard clearance for weight, no left or right deviation |
|
|
|
|
Coating working pressure |
Stable pressure with no fluctuations and no bias. |
|
|
|
|
Unwinding/Rewinding Tension |
The winding tension is 20%–30% lower than the unwinding tension, and there is no edge slippage. |
|
|
|
|
Oven Sectional Temperature |
Inlet/Middle/Outlet temperatures are as per process card; no overheating. |
|
|
|
|
Drying moisture content |
The finished product has a moisture content of 8%–11%. |
|
|
|
III. Inspecting Coating Liquid Parameters (Preventing Whitening, Exposed Base Material, and Powdering)
|
Inspection items |
standard |
Actual measurement |
determination |
|
Coating solids content |
Process standard ±1% |
|
|
|
Coating viscosity |
Standard viscosity range, no agglomeration |
|
|
|
Stirring state |
Continuous stirring, no sedimentation or stratification |
Visual inspection |
|
|
Coating cleanliness |
No impurities, no colloids, no skin. |
Visual inspection |
|
IV. Coating Appearance Quality Inspection (High-Frequency Defect Inspection)
Sampling method: Samples are taken from the beginning, middle and end of each roll.
|
Appearance defects |
Qualification Standard |
Does it exist (no/yes)? |
Disposal |
|
Coating uniformity |
Consistent color difference between left and right sides, no uneven coloring. |
|
|
|
Stripes/Brushed |
No transverse or longitudinal coating stripes |
|
|
|
Pinholes/White Spots |
The entire surface is free of dense pinholes and white spots. |
|
|
|
Particulate impurities |
There are no raised particles or pinholes when touched. |
|
|
|
Slip-on/Thin-on coating |
No exposed base layer, thin local coating |
|
|
|
Wrinkles/Scratches |
The paper surface is flat, without creases or wrinkles. |
|
|
|
End face alignment |
End face misalignment ≤2mm |
|
|
V. Key physical property testing (mandatory testing specifically for thermal paper)
|
Testing items |
industry standards |
Test results |
determination |
|
Dry film coating thickness |
Total coating thickness: 5–8 μm, with a deviation of ±1 μm |
|
|
|
Colorimetric sensitivity |
The printing produces uniform blackness, fast color development, and no light prints. |
Test Print |
|
|
Base whiteness |
The base color is clean and free of yellowing or graying. |
Visual comparison of samples |
|
|
Coating adhesion |
No powder or delamination when the tape is peeled off. |
Tape test |
|
VI. Recording and Handling of Anomalies During Initial Inspection/Patrol Inspection
- The main abnormalities identified during this inspection were:
- Abnormal Handling Procedures: Shutdown for Adjustment □ Fine-tuning Parameters □ Isolate for Inspection □ Normal Production □
- Re-inspection results: Pass □ Fail □
VII. Signature Confirmation
Operator confirmation: Inspector confirms: Team leader confirms: Inspection time:
Simplified SOP for workshop inspection
- First inspection must be performed before starting the machine, changing the roll, adjusting the machine, and changing the coating ; mass production can only begin if the inspection is passed.
- Test every 30 minutes: temperature, humidity, thickness, and color development effect;
- If stripes, uneven thickness, or poor color appear , stop the machine immediately and adjust it . Mass production with defects is prohibited.
- When humidity exceeds 60%, strictly control the coating speed to prevent the coating from absorbing moisture and turning white, and to prevent poor adhesion.
- Excessive winding tension is strictly prohibited to avoid coating back adhesion and printing failure.