Case Share:Thermal paper manufacturing troubleshoot and solution
Case Share:Thermal paper manufacturing troubleshoot and solution
Problem Description from Client:
“if the thermal paper formula and paper quality were unchanged during production, what could be causing the thermal paper's quality to deteriorate and the durability of the print on the paper to decrease? Thermal paper may be of good quality during production, but after two days, the print quality on samples of the same paper deteriorates. Also, after two days, the print gradually disappears from the printed thermal paper. “
“When it was hot, we had a problem with the thermal paste constantly thickening and becoming more viscous. At the same time, the humidity was high.”

Photo 1:print quality after production

Photo 2:print quality after 2 days
thermal paper production details confirmation with cilent(base paper/formulation/equipment/QC) as per below table:
|
item |
Jiaqi comments |
|
Base paper specification |
OK |
|
Precoat slurry formulation |
OK |
|
Thermal sensitive coat slurry formulation |
there are some minor issues with the formulation |
|
Calender Information: Material: polyurethane, hardness: 80 Shore A |
The hardness of this calendering roller is too low,result in poor calendering effect.Fortunately, it is coated using two scrapers. |
|
Particle size of slurry:no data |
No testing machine to test the quality of thermal paper coating slurry |
|
Thermal paper coating slurry production machine status: Two mills for each grinding machine; 60 liter; Screen size:0.5mm Grinding balls is 125kg Grinding ball size:1.2-1.4mm Grinding time:4 hours grinding temperature:12-15 degrees Celsius |
grinding equipment and the grinding process are far from sufficient should probably use a particle size analyzer to test the A and B materials separately. The sieve and beads of the grinder are too coarse, which directly results in the particle size of the grinding liquid being unable to be small. At the same time, the amount of beads in the grinder is a bit low,based on such equipment parameters, it is unlikely to grind the coating properly in just 4 hours. |
Short-term improvement measures:
1.try increasing the pre-coating weight to around 5 g/m², which should resolve or significantly improve the issue.
2.Based on the grinding machine parameters, the specifications for the screen and beads are too large, and the amount of beads loaded is also insufficient. extend the grinding time from 4 hours to 12 hours.
3.The separator with a sieve is best configured with two machines of 0.4mm paired with 0.8-1.0mm beads, and two machines of 0.3mm paired with 0.6-0.8mm beads. Each grinder should be loaded with 140-150 kilograms of beads.
Long term improvement measures:
1. Purchase one particle size testing machine to test the quality of coating slurry.
2. Optimize the coating slurry formulation
3. Update the calendering roller in the thermal paper coating production line